Heavy lift terminal for handling and storing of components for wind energy turbines.
- Direct access on the Weser estuary with short sailing distances and no lock passage
- Tri-modal connections: seamless transport by water, road, and rail into the heart of Europe
- Three dedicated heavy-lift access routes linking the port directly to the German highway network
- Extensive terminal areas and warehouses with floor load capacities of up to 20 t/m²
- Comprehensive services: stevedoring, l/s/d, transport and fixture logistics, packaging
- Shore cranes with a lifting capacity of up to 200 mt
Neustadtstrasse 15
26919
Brake
Deutschland
+49 4401 914-423
wind-projects [at] jmueller.de
Branchen
Logistik, Sicherheit, Montage und Demontage